Saturday, 9 February 2013

Feb Renos start Basement Bathroom Bedroom

Wastepipes for shower , toilet and basin installed

Crisis break into Pries clay drain pipe running below basement floor

Apprentice clearing channel under wall for waste pipe to new laundry room

The master solves the crisis with double sleeve join underwater

Wall framed between bedroom and bathroom
The work in the first days of month was to put in the new waste pipes, frame the walls, straighten out the wiring and put in the new pec pipe plumbing using both compression and shark joins for the new bathroom, bedroom and power room. In addition the waste pipe through to the new laundry room was put in place.